henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

What caused the declaration of war?
_______ are malicious programs that come into a computer system disguised as something else such as a free computer game or screen saver.
what are land use model?​
Why is polygamy beneficial to society
Fill in the concept map with details about linnaean taxonomy.
This figure represents a flower box. How much soil will it take to fill the flower box? Enter your answer in the box. in³ Three-dimensional figure that could b
PRESLEY A drivers' education company offers a classroom instruction program or a full program which also includes driving. In the fall session, they had 14 stud
Steve bought 24 ounces of his favorite cereal. He put equal amounts of the cereal in 4 containers. How many ounces did he put in each container?​
what the geometric mean of 18 and 30 as a square root?
Help picture below problem 12