wanakachakaren17
wanakachakaren17 wanakachakaren17
  • 03-12-2021
  • Mathematics
contestada

if 10 man can work 6hours.How many more men are needed towork in 4 hours​

Respuesta :

mathstudent55
mathstudent55 mathstudent55
  • 03-12-2021

Answer:

5 more men

Step-by-step explanation:

10 men do a job in 6 hours.

To do the job in 2 hours, 1/3 of the time, you need 3 times as many men.

30 men do a job in 2 hours.

To do the job in twice the time, 4 hours, you need half the men.

15 men do a job in 4 hours.

15 men - 10 men = 5 men

You need 5 more men.

Answer Link

Otras preguntas

9.157 divided by 9.52
write an equivalent expression.
Please help I don’t understand if you can answer just one or both pleaseee
A diver descends from an elevation of 6 feet below sea level to an elevation of 106 feet below sea level in 2 equal intervals. What was the diver's change in el
Suzanne wants to put a fence around her square garden. If the garden covers an area of 64 ft^2, how many feet of fencing does she need? Area = length x width an
(x+6)(x+3) = x²+6x+3x+18 What’s the proof here ?
A Hand sanitizer was advertised to be more effective than antibacterial soap what’s the independent variable and dependent variable?
Please see the attached question and help me solve it.
Solve the equation X/-2=5
Which mutation will cause translation to stop? Group of answer choices Mutation 2 only Mutations 1, 2, and 3 Mutations 1 and 3 only Mutation 1 only