IUlawyer8169 IUlawyer8169
  • 01-01-2021
  • Business
contestada

When multiple teams work together on the same product each team should:_____.

Respuesta :

Parrain
Parrain Parrain
  • 03-01-2021

Answer: B. False

Explanation:

A product backlog is the list that records the improvements to be made to a product.

Teams operating separately should not have multiple backlogs but should have one so that when the team mean to develop the product looks at the backlog, there is one single authoritative file instead of multiple ones that could complicate things.

Answer Link

Otras preguntas

The product of two whole numbers is 650 and their sum is 51. What are the two numbers?
Which sentence is punctuated correctly? If it rains on Saturday, Hillary’s baseball game will be canceled, and Jake’s basketball game will take place in the gym
how to factorise the following: a, e, i, j and m
Which statement best describes the relationship between primary and secondary sources?
As a general rule, women __________.
Lesson 9: Matter Unit Test Physical Science A Unit 1: Matter
solve the equation for x. x/3 = (2x + 3)/7A. B. 2 C. 3 D. 3/7 E. -3
Why did the Anti-Federalists oppose ratification of the Constitution?
The diagram shows structures that represent different levels of organization in a human. Which is the second smallest level of organization?
Triangle measures x,2x,3x whats perimeter simplified