Deuce6694 Deuce6694
  • 02-09-2019
  • Social Studies
contestada

Which two actions are part of the Scrum Master's role in PI Planning?

Respuesta :

rejkjavik rejkjavik
  • 12-09-2019

Answer:

1) time spent on analyzing every story is more

2) part timer scrum master are not much have proper time to plan

Explanation:

scrum is a lean system engineering rtechniques

the two action that are the crucial part of scrum master's role in PI planning is

1) time spent on analyzing every story is more than the other part

2)part timer which work as a scrum master do not have proper time slot to plan as important member of team.  

Answer Link

Otras preguntas

Which expressions are equivalent to 4(4a+5)4(4a+5) ? Choose 3 answers: Choose 3 answers: (Choice A, Checked) A 16a + 516a+5 (Choice B, Checked) B 16a+2016a+20
Mo’s Farm stand sold a total of 165 pounds of apples and peaches. She sold apples for 1.75 per pound and peaches for 2.50 per pound. If she makes $337.50 how ma
Explain work please
what happened to the lands of Western Roman Empire after it collapsed
Escoge la descripción correcta del tiempo. Hace fresco, sol y el día está despejado. Hace buen tiempo. Hace mal tiempo.
Clarify the beliefs of president Lincoln
Which stanza of Robert Frost’s "The Road Not Taken” most supports the theme that sometimes human beings feel conflict because they cannot have everything they d
Estimate 55 percent of 64
On a 50 question test a student awncerd 5 questions wrong what percent did he awncer correctly
How does choice of narrator affect characterization